Steve Jones

Subscribe to Steve Jones: eMailAlertsEmail Alerts
Get Steve Jones: homepageHomepage mobileMobile rssRSS facebookFacebook twitterTwitter linkedinLinkedIn


Top Stories by Steve Jones

After building a number of clusters from the ground up -including one that made it to the Top500 Supercomputer list - I decided to try a service that many vendors now offer - having a system racked and stacked at the factory then shipped to us. Such a service saves a huge amount of time, not to mention my back, not having to build the cluster and cable all the equipment together. I've been a fan of well-cabled systems and have found the quality control to be acceptable. The key component is the pre-build requirements and verification before the system is built. This will ensure the system shipped is what is expected when it arrives at your front door. There can still be a fair amount of cabling that has to be done once it arrives, if you have a multi-rack configuration, but it's usually limited to plugging in the system's power and public network. Once this is done... (more)